Thursday, April 21, 2005

Construction Update

A construction meeting was held on April 21, 2005 @ 9:00 a.m.

During the next two weeks:
The slab in the band room will be poured at Lincoln. All the cement floors will be poured at Webster. The floors in the large band room, corridor 112, and the weight room will be poured at Plymouth High School. The footings for the mezzanine walls in the music area at PHS will be poured next week. The internal walls in the music room at Plymouth High School will be completed. The mezzanine walls and steel will be up in the music area. The interior walls at Webster will be completed. The footers and the foundations will be poured for the dry storage areas at Lincoln Junior High. Insulation on the Webster roof will be installed and shingling will begin. Windows at Webster and Washington will be installed. The kitchens at Lincoln and Washington will be painted through the finish coats. The ceiling grid will be started in the Washington and Lincoln kitchens. The brick at Webster will be caulked and sealed. Temporary coverings will be constructed at Lincoln and Washington for the wall demolition.

Installation of kitchen equipment:
It was announced that the kitchen equipment will arrive and be installed at Lincoln on June 1, 2005. Installation of kitchen equipment at Washington will begin on June 15, 2005.

Pre-Construction Meeting for Phase II:
The pre-construction meeting for Phase II was conducted this morning at 10:00 a.m. All contractors will begin mobilization. The CCI construction trailer will be on site at the new elementary next Wednesday. Construction schedules will be issued in the near future.

The next meeting date for Phase I is May 5, 1005.