Tuesday, February 07, 2006

Blog Bits

Board Highlights
The Board of Trustees met in regular session last evening at Plymouth High School. In addition to its regular business, the board conducted a hearing on redistricting. The majority of those patrons present favored Plan B. Concerns were expressed about the potential size of Jefferson.

The Board adopted the 2006-2007 school calendar.

August 15 First Teacher Day
August 16 First Student Day
September 4 Labor Day (Paid Day)
October 18-19 Student ½ Day
Parent/Teacher Conf.
October 20 Fall Break
November 1 In-service Day
November 23-24 Thanksgiving Break
December 1 In-service Day
December 25-Jan 5 Winter Break
January 17 In-service Day
February 16 In-service Day
February 19 President’s Day
March 6 In-service Day
March 26-30 Spring Break
April 6 Good Friday (snow make-up)
April 19 In-service Day
May 24 Last Day for Students
May 25 Last Teacher Day


The board employed ForeSight Engineering to serve as civil engineer for the rehabilitation of the Soccerplex.

The next board meeting will be at Jefferson Elementary on February 16, 2006 at 7:00 p.m.


Construction Update

Last Thursday and Friday at Webster, Washington, Lincoln and Plymouth High School, a walk-through was conducted by the construction manager and corporation administrators. The Punch Lists were updated. Contractors will begin concentration on those incomplete items or those items in need of correction.

At Riverside, the project is complete with the exception of the installation of white boards.

At Jefferson Elementary, the ceiling grids in the new edition have been installed. Light fixtures are now in place. The new fire alarm system has been completed. Windows in the new edition are installed. Carpeting and casework will arrive the first week of March. Painting will be completed during the next two-week period. Contractors are anticipating the delivery of the HVAC classroom units during the next month.

At the new Menominee, a major concrete pour in the Kindergarten and administrative area is scheduled to take place on Wednesday. The work on the roof over the western section of the building will take place as weather permits. Plumbing and electrical rough-ins continue throughout the building. Sheet metal work is in progress in the dining room, art, and kitchen areas. Bulkheads are under construction in the dining room and commons area. The windows for the building have been delivered. Installation of the windows will take place in the near future. Preparation for concrete pour #3 is underway. The masons are completing the brick veneer on the south side of the building and installing the non-supporting walls in section A.


Change Order Report
The change order report is as follows: At Plymouth High School there have been a total of 17 change orders for a cost of $42,685.29. At Webster, Washington, and Lincoln, there have been a total of 35 change orders for a cost of -$9,825.49. At Jefferson, Riverside, and new Menominee there have been seven change orders for a cost of $9,235.00