Thursday, June 16, 2005

Construction Update

A construction meeting was held on June 16, 2005 @ 9:00 a.m.

During the next two week period:

Lincoln Junior High
The kitchen equipment will be installed. The installation of the ceiling tile will be completed in the kitchen, the choir room, and the music room. Acoustical wall tiles will be hung in the choir room and music room. The floor covering will be installed in the choir room and music room. Tile will be installed in the locker room. The ceiling grid will be put in place in the locker room area. The blacktopping will be completed at this site. The renovation of the current teacher work room into a new nurse’s office will begin today. The case work will be set in the music and choir room. The roof will be installed over the dry storage area; once that is completed, the quarry tile will be laid in the dry storage area.

Washington Elementary
The front entrance will be completed. The vinyl wall covering will be put in place on the bulkhead in the cafeteria. The kitchen equipment will be delivered next Tuesday. Installation will begin immediately. The studs and drywall in the renovated area will be installed. The ceiling grid will be put in place in the music room and choir room. A steel beam will be set in the wall that separates the gym and music room. Curbs and sidewalks will be installed.

Webster Elementary
The shingling of the roof will be completed by Tuesday. Quarry tile will be installed in the restrooms. Ceiling grid and insulation will be installed. The blacktopping will take place next week.

Plymouth High School
The finish studs on the music wing will be completed. Siding and insulation will begin immediately thereafter. The roof will be completed in the music wing. Windows will be installed in the music wing. The painting will begin in the music wing. Masonry work will continue in the multi-purpose wing. Steel will be set over the weight room. Site improvements will continue, especially the road which will go to the west of the new music room. Interior demolition will begin on Monday.

Jefferson Elementary
Utilities will be relocated. The installation of the footers and foundations will begin.

Menominee Elementary
Demolition for the new band room will take place. The construction of the new walls will begin.

New Elementary School
The installation of footers and foundations will begin.


**REMINDER TO ALL STAFF MEMBERS**
The week of June 27th there will be no power at the high school.
The next construction meeting will be Thursday, June 23, 2005.